White Electrical Logo

Electrical Excellence For 100 Years

Contact Us: 1-888-519-4483
An Employee Owned Company
Home Why
White
Services Industries Safety Project Profiles Customers Partner Links Careers Locations News Site Map Contact Us
PROJECT PROFILES:
Airborne lnn
Alcoa, Tennessee City
Children's Place
Federal Bureau of Prisons' Medical Center
Georgia Power - Harlee
Georgia Power -  Bowen
Jacksonville International Airport
Little Dix Bay Resort
National Alabama Corporation
Paper Petroleum Industries
Pee Dee River Bridge Monitoring System
Southern Natural Gas/
El Paso Gas
Volkswagen
 

QUICK CONTACT











Security Code


 
 
 
 
Switchgear

 Volkswagen Switchgear Project

Project Name: Volkswagen Medium Voltage Switchgear Project
   
Background Information:


  • Owner: Volkswagen Group of America
  • Location: Chattanooga, TN
  • Contract Value: Over $2 million
   
Description:









  • Installation of two 15,000 volt switchgear lines, consisting of 50 medium voltage breakers, to feed the new Volkswagen plant complex in Chattanooga, TN
  • Installation of remote Control Panels to operate each 15kV breaker which protects personnel from any and all arc flash issues.
  • Installation of multi-conductor cables between the switchgear breakers and the control panels to integrate the control systems for remote function.
  • Checkout and commissioning of the entire controls system for this installation to ensure reliable functionality upon energizing the 15kV switchgear to feed multiple plant buildings.
  • All offloading, rigging and setting in place of the equipment was performed with multiple other crafts working in the same areas as we all pushed to complete the project on time.
   
Challenges:








  • Design challenges were plentiful as we worked closely with the Owner, engineering firm and manufacturer to ensure that the finished product was exactly what the Owner needed in this "first of its kind" automobile manufacturing plant in the US.
  • The Owner wanted the equipment operational in a very short time frame to enable the testing of equipment in multiple buildings in the complex. We were able to beat the scheduled date by several days even though changes were taking place up to the end of the project.
  • Portions of the job had to be scheduled meticulously for outages that had to take place since the Owner wanted to "go live" prior to some of the changes being incorporated into the project.
  • Working closely with the Owner to ensure that nothing was lost in translation between what they wanted in Germany and what we produced in the US.
   
Summary:
This was a successful job for White Electrical as we completed each phase of the work on time or early and enabled the Owner to utilize his 15kV switchgear system for operation of the facility.
   

White Electrical Construction Company

Electrical Contractors serving the Southeast

Alabama - Georgia - Florida - North Carolina - South Carolina - Tennessee

With Offices In: Atlanta - Birmingham - Savannah - Jacksonville - Raleigh - Chattanooga

Home     Why White     Services     Industries     Safety     Project Profiles     Customers     Partner Links     Careers     Locations     News     Site Map     Contact Us