Project Name |
City of Alcoa, Tennessee |
| |
|
Background
Information:
|
-
Location: Alcoa, Tennessee
-
Contract Value: $2.8 Million
-
Partnered With: OESCO
|
| |
|
Description
|
- Installation of all electrical and control wiring
for new 16 MGD coagulation membrane water treatment
facility.
- Installation of 4000 amp incoming service and
switchgear.
- Installation of variable speed drives to control the
intake and output water flow.
- Installation and termination of all control wiring
for a Zenon filtration control system.
- Installation of an under slab conduit system
consisting of several miles of under slab conduits for
power and control.
- Installation of lightning protection for the
facility.
|
| |
|
Challenges:
|
- Very aggressive completion schedule.
- Plant had to be operational at a reduced capacity to
allow demolition of existing. Demolition of
existing plant had to be accomplished to re-route output
lines to the area served. This had to be
accomplished during a low usage period to minimize water
flow disruptions to customers.
- Completion of the remainder of the plant while in
operation.
|
| |
|
Summary:
|
This was a successful job for White Electrical contractors. We
completed each phase of the work on time or early and within
budget. |
| |
|
| |
|
| |
|