White Electrical Logo

Electrical Excellence For 100 Years

Contact Us: 1-888-519-4483
An Employee Owned Company
Home Why
White
Services Industries Safety Project Profiles Customers Partner Links Careers Locations News Site Map Contact Us
PROJECT PROFILES:
Airborne lnn
Alcoa, Tennessee City
Children's Place
Federal Bureau of Prisons' Medical Center
Georgia Power - Harlee
Georgia Power -  Bowen
Jacksonville International Airport
Little Dix Bay Resort
National Alabama Corporation
Paper Petroleum Industries
Pee Dee River Bridge Monitoring System
Southern Natural Gas/
El Paso Gas
Volkswagen
 

QUICK CONTACT











Security Code


 
 
 
 
 
 
 

National Alabama Corporation

Project Name National Alabama Corporation
   
Background Information:



  • Location: Cherokee/Muscle Shoals, Alabama
  • Contract Value: Over $5 million
  • Partnered With: Infosys - A Division of OESCO, an FEC Partners
   
Description
















  • All backbone data, security and WIFI infrastructure for this 1.9 million square foot manufacturing facility making railroad cars for companies worldwide.
  • Installation of 19 MDF and IDF closets for network system components which included equipment racks, ladder trays and grounding buss for this facility.
  • Installation of signal grounding system consisting of a 4/0 AWG ground loop and 2" PVC conduit to tie the communication MDF and IDF closets together for a redundant signal ground.
  • Installation of more than a mile of Air Blown Fiber Tubing Pathway to provide raceway for the network system fiber optics cabling. The majority of the pathway was 19 Tube raceway terminating in TDU cabinets near each MDF or IDF closet.
  • Installation of several miles of 18 strand, Air Blown Fiber Cabling to provide a redundant fiber link system for the facility network.
  • Installation of over half a million feet of CAT6 Augmented cable for the Data Communications network system includeding conduit and cabling for the drops for Data, Phone, Security and WIFI systems throughout the plant.
  • Installation of all power circuits required for network system equipment throughout the entire facility.
   
Challenges:






  • Fiber and grounding system was to be installed as the General Contractor was finalizing the building construction and in a three month time frame. We beat the scheduled completion date.
  • Installation of Data Communications system cabling as the Owner was in the process of commissioning their equipment which meant that portions of the process was operable.
  • Installation of the Security and WIFI cabling systems while the plant was in operation which meant multiple shifts required to meet the schedule.
   
Summary:

This was a successful job for White Electrical contractors and our partner, Infosys - A Division of OESCO. We completed each phase of the work on time or early and within budget to enable the owner to utilize his network system for operation of the facility.
   

White Electrical Construction Company

Electrical Contractors serving the Southeast

Alabama - Georgia - Florida - North Carolina - South Carolina - Tennessee

With Offices In: Atlanta - Birmingham - Savannah - Jacksonville - Raleigh - Chattanooga

Home     Why White     Services     Industries     Safety     Project Profiles     Customers     Partner Links     Careers     Locations     News     Site Map     Contact Us